1. Executive Summary

The project successfully validated the Edge Compute Bus (Power/Thermal/Compute) but failed on the Payload Physics (RF Interception & Uplink). The decision to terminate is based on the inability to close the link budget for passive interception and the logistical impossibility of maintaining ML models via current S-Band infrastructure.


2. Platform Success Validation (The "Truck")

2.1 Power Budget Simulation

We validated the ability to support 3x Jetson Orin NX modules. The critical constraint was the Energy Balance (EbalE_{bal}) over one orbital period (TorbitT_{orbit}).

The simulation modeled the battery State of Charge (SoCSoC) as:

SoC(t)=SoCinitial+∫0t(Pgen(t)−Pload(t)) dtSoC(t) = SoC_{initial} + \int_{0}^{t} (P_{gen}(t) - P_{load}(t)) \, dt

Where:

  • Generation (PgenP_{gen}): Modeled using a Variac/Rectifier setup simulating Solar Flux (Φsolar≈1360W/m2\Phi_{solar} \approx 1360 W/m^2) adjusted for incidence angle θ\theta and eclipse duty cycle. Pgen(t)=ηmppt⋅Aarray⋅Φsolar⋅cos⁡(θ(t))⋅δsun(t)P_{gen}(t) = \eta_{mppt} \cdot A_{array} \cdot \Phi_{solar} \cdot \cos(\theta(t)) \cdot \delta_{sun}(t)
  • Load (PloadP_{load}): The dynamic load of 3x Orin NXs running YOLO inference. Pload≈3×(15W to 25W)+PbusP_{load} \approx 3 \times (15W \text{ to } 25W) + P_{bus}

Result: With a calculated duty cycle of ≈30%\approx 30\% (firing compute only over Areas of Interest), the depth of discharge (DoD) remained <20%< 20\%, preserving cycle life.

2.2 Thermal Analysis

Heat dissipation in vacuum is purely radiative. The Stefan-Boltzmann law dictated our surface area requirements:

Qrad=ϵσA(Tsurf4−Tspace4)Q_{rad} = \epsilon \sigma A (T_{surf}^4 - T_{space}^4)
  • Heat Load (QgenQ_{gen}): ≈75W\approx 75W peak.
  • Result: The calorimetric box tests proved that while continuous operation would lead to thermal runaway (Qgen>QradQ_{gen} > Q_{rad}), the thermal mass of the chassis combined with the 30%30\% duty cycle allows the system to radiate stored heat during eclipse/idle periods.

3. The Kill Chain: Failure Analysis

3.1 Passive Interception (The "Two Bullets" Physics)

The core mission was passive interception of cross-link or downlink sidelobes from a target satellite. This failed due to geometry and Friis transmission limits.

The Geometry Problem

LEO satellites move at v≈7.6 km/sv \approx 7.6 \text{ km/s}. In a crossing orbit scenario (e.g., 90∘90^\circ inclination difference), the relative velocity vector magnitude is:

∣v⃗rel∣=vsat12+vsat22−2vsat1vsat2cos⁡(α)≈10.7 km/s|\vec{v}_{rel}| = \sqrt{v_{sat1}^2 + v_{sat2}^2 - 2v_{sat1}v_{sat2}\cos(\alpha)} \approx 10.7 \text{ km/s}

The "Dwell Time" (TdwellT_{dwell}) within a target's sidelobe (assuming a sidelobe beamwidth of θsl≈2∘\theta_{sl} \approx 2^\circ at a distance d=100 kmd = 100 \text{ km}) is:

Tdwell≈d⋅tan⁡(θsl)vrel≈100⋅0.03510.7≈0.32 secondsT_{dwell} \approx \frac{d \cdot \tan(\theta_{sl})}{v_{rel}} \approx \frac{100 \cdot 0.035}{10.7} \approx 0.32 \text{ seconds}

We have roughly 300ms to detect, lock, and demodulate.

The Link Budget Collapse

The Link Margin (MM) was calculated using the Friis Transmission Equation, modified for sidelobe interception:

Prx=Ptx+Gtx(θ)+Grx−Lfspl−LsysP_{rx} = P_{tx} + G_{tx}(\theta) + G_{rx} - L_{fspl} - L_{sys}

Where:

  • PtxP_{tx}: Target transmit power (High).
  • Gtx(θ)G_{tx}(\theta): The Killer Variable. We are not in the main beam (30 dBi30 \text{ dBi}). We are in the sidelobes, where gain is often negative or zero (Gtx≈−5 to 0 dBiG_{tx} \approx -5 \text{ to } 0 \text{ dBi}).
  • LfsplL_{fspl}: Free Space Path Loss. Lfspl=20log⁡10(d)+20log⁡10(f)+92.45L_{fspl} = 20\log_{10}(d) + 20\log_{10}(f) + 92.45

The Energy Per Bit (Eb/N0E_b/N_0) Reality: To demodulate complex data (e.g., QPSK/16QAM), we need a specific Eb/N0E_b/N_0.

EbN0=PrxkB⋅Tsys⋅Rbit\frac{E_b}{N_0} = \frac{P_{rx}}{k_B \cdot T_{sys} \cdot R_{bit}}
  • RbitR_{bit}: Target data rates are high (>100 Mbps>100 \text{ Mbps}), which dilutes energy per bit.
  • PrxP_{rx}: Extremely low due to sidelobe attenuation.

Result: The resulting Eb/N0E_b/N_0 was consistently below the Shannon Limit for the required modulation schemes. The data received was indistinguishable from the noise floor.

3.2 Uplink Asymmetry (The ML Ops Wall)

We determined that "Static AI" is useless. Models must be updated.

Data Transfer vs. Orbital Mechanics

  • Model Size (SmodelS_{model}): A quantized YOLO model + weights ≈300 MB=2.4×109 bits\approx 300 \text{ MB} = 2.4 \times 10^9 \text{ bits}.
  • S-Band Uplink Rate (RupR_{up}): Realistically limited to ≈256 kbps\approx 256 \text{ kbps} for robust uplink.
  • Pass Duration (TpassT_{pass}): Average visible pass ≈600 seconds\approx 600 \text{ seconds}.

Total Data per Pass:

Dpass=Rup×Tpass=256×103×600≈153 MbD_{pass} = R_{up} \times T_{pass} = 256 \times 10^3 \times 600 \approx 153 \text{ Mb}

Passes required for ONE update:

Npasses=SmodelDpass=2400 Mb153 Mb≈15.6 passesN_{passes} = \frac{S_{model}}{D_{pass}} = \frac{2400 \text{ Mb}}{153 \text{ Mb}} \approx 15.6 \text{ passes}

Conclusion: It would take 16 perfect passes (approx. 2-3 days of operations) to update a single model. This assumes 0% packet loss. Given the bit error rates in S-Band tumbling, the probability of a corrupted model file is near 100%100\%.

Since commercial X-Band uplink is not available, we cannot sustain the "Continuous Learning" requirement of the mission.


4. Final Verdict

The Compute Payload is viable. The RF Payload is physically impossible with current antenna sizes (SWaP constrained). The ConOps is logistically impossible without Optical Inter-Satellite Links (OISL).

Action: Terminate. Archive "Truck" designs. Wait for OISL commoditization.

5. Whitepaper

The following is the white paper of the Pathfinder Mission: